Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 7, 2024

No Information to Display

1102 S Goodwin Ave

Renovation

No Information to Display

$500,000.00

Public - State/Provincial

img_map_placeholder

1102 S Goodwin Ave, Urbana, IL

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Art & Design Building and Turner Hall Substation. Project Description Art + Design replace the two (2) unit substations in room 0045 with one (1) new unit substation. Currently one unit substation (meter 0219-E1) feeds Art & Design, and the other (meter 0220-E1) feeds Krannert Art Museum. Meter 0219-E1 is a 4160V-208Y/120V, with a 750kVA transformer and two (2) 1600A main breakers. Meter 0220-E1 is a 4160V-208Y-120V with a 225kVA transformer. The loads associated with Krannert Art Museum unit substation (meter 0220-E1) will be refed from the new unit substation via a splice box inside the existing electrical room. These loads will be sub-metered. At Turner Hall, there are two unit substations located in S18 on the basement level. One unit substation (meter 197-E1) is 4160V - 208Y/120V with (2) 3000A main breakers and a 750kVA transformer. The second unit substation (meter 197-E2) is 4160V - 480Y/277V with (1) 3000A main breaker and a 750kVA transformer. The existing area well is blocked on the front, right, and above by the building. This makes dropping in new substations via the area well not feasible. Because of this, a new 1,000 kVA 4160-277/480V transformer will be installed on site and feed a new 1200A, 480/277V switchboard located in S18. There will be a 500kva 480-120/208V transformer and 1200A, 208/120V switchboard located in S18. The existing load are fed out of a top hat junction box located over the existing substations. The new switchboards will be located under these boxes to connect new to existing. Project Labor Agreement This project includes a Project Labor Agreement that will be executed between the lowest responsible responsive bidder and the East Central Illinois Building and Construction Trades Council. A copy of the Project Labor Agreement is included at the end of Section 00 90 00. This Project is located at Art & Design Building, University of Illinois Urbana-Champaign, 408 E. Peabody Dr., Champaign, IL 61820. Turner Hall, University of Illinois Urbana-Champaign, 1102 S. Goodwin Ave., Urbana, IL 61801. Bid Acceptance or Rejection The Owner reserves the right to reject any or all bids or any part thereof, to waive any informalities in the bidding, and to accept the bids deemed to be in the best interests of the Owner after all bids have been examined and evaluated. Alternates, if considered, will be accepted in any order as determined by the Owner.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.