Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

July 8, 2024

September 6, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$500,000.00

Public - County

img_map_placeholder

Multiple Locations, Minneapolis, MN

Subscribe to View Full Documents

ADA PED RAMP RETROFITS PHASE 4 The Major Items of Work Are Approximately: 1 Lump Sum as Built; 1 Lump Sum Mobilization Area 1; 1 Lump Sum Mobilization Area 2; 1 Lump Sum Mobilization Area 3; 1 Lump Sum Mobilization Area 4; 1 Lump Sum Mobilization Area 5; 1 Lump Sum Mobilization Area 6; 1 Lump Sum Mobilization Area 7; 1 Each Grubbing; 3 Each Remove Casting; 6 Each Remove Drainage Structure; 28 Each Salvage Sign; 116 Lin Ft Remove Sewer Pipe (Storm); 1747 Lin Ft Remove Curb & Gutter; 10 Sq Yd Remove Concrete Pavement; 107 Sq Yd Remove Bituminous Pavement; 1402 Sq Ft Remove Bituminous Walk; 11830 Sq Ft Remove Concrete Walk; 5034 Sq Ft Remove and Replace Bituminous Pavement; 32 Hour Street Sweeper (With Pickup Broom); 10 Sq Yd Concrete Pavement 8.0"; 153 Lin Ft 12" Rc Pipe Sewer Class V; 1 Each Connect to Existing Storm Sewer; 2 Each Adjust Hydrant; 4 Each Adjust Valve Box; 12.5 Each Const Drainage Structure Design H; 10 Each Casting Assembly; 13 Each Adjust Frame & Ring Casting; 5 Lin Ft Const Drainage Structure Design Spec 1; 4 Each Connect Into Existing Drainage Structure; 725 Each Drill & Grout Reinf Bar (Epoxy Coated); 13478 Sq Ft Concrete Walk; 1772 Lin Ft Concrete Curb & Gutter; 209 Lin Ft Concrete Curb Design V; 1023 Sq Ft Truncated Domes; 12 Each Adjust Handhole; 1 Lump Sum Traffic Control Supervisor; 1 Lump Sum Traffic Control Area 1; 1 Lump Sum Traffic Control Area 2; 1 Lump Sum Traffic Control Area 3; 1 Lump Sum Traffic Control Area 4; 1 Lump Sum Traffic Control Area 5; 1 Lump Sum Traffic Control Area 6; 1 Lump Sum Traffic Control Area 7; 1 Lump Sum Alternate Pedestrian Route Area 1; 1 Lump Sum Alternate Pedestrian Route Area 2; 1 Lump Sum Alternate Pedestrian Route Area 3; 1 Lump Sum Alternate Pedestrian Route Area 4; 1 Lump Sum Alternate Pedestrian Route Area 5; 1 Lump Sum Alternate Pedestrian Route Area 6; 1 Lump Sum Alternate Pedestrian Route Area 7; 350 Unit Day Portable Changeable Message Sign; 19 Each Sign Collar; 28 Each Install Sign; 2 Each Adjust Handhole; 1 System Revise Signal System a; 1 System Revise Signal System B; 1 System Revise Signal System C; 1 System Revise Signal System D; 1 System Revise Signal System E; 1 Lump Sum Erosion Control Supervisor; 42 Each Storm Drain Inlet Protection; 140 Lin Ft Sediment Control Log Type Compost; 33 Each Site Restoration; 1160 Sq Ft Crosswalk Pref Thermo Gr in; All in Accordance With Specifications and Bid Forms.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects