Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 16, 2023

January 15, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$1,305,000.00

Public - City

img_map_placeholder

Multiple Locations, Santaquin, UT

Our team is requesting plans for this project.

Subscribe to View Full Documents

Due to this requirement, Santaquin is reissuing a Request for Bids for the Santaquin Main Street Project with the following adjustments: 1. Alternate A: Project completion date: May 31, 2025 2. Alternate B: Project Completion date: May 31, 2025 3. Alternate C: Project Completion date: October 15, 2025 4. Division 1M.1.07 (Page 1M-4): removed "Installation of power, telecommunications, and gas lines is planned for winter of 2023/2024 and will have to be completed prior to roadway construction. Preform project utility work as much as practical during the winter of 2023/2024, prior to roadway construction beginning in early 2024." 5. The following comments from the previous bid are in still in place and inform this rebid: a. Santaquin City will provide Civil3D and CAD files to the awarded Contractor. They are for the Contractor's convenience, are to be used at the Contractor's risk, and their use is subject to the J-U-B Electronic Documents/Data Limited License b. Replace Key Note 20 on the Demolition Roadway and Utility Plans (C-000 series sheets) with, "REMOVE GASE LINE AS REQUIRED (by DOMINION ENERGY)" c. Replace paragraph SC-5.06.B in the Supplementary Conditions with the following: "The existing natural gas line in Main Street owned by Dominion Energy is believed to be asbestos coated. Dominion Energy will remove any gas pipe where it conflicts with project improvements. All steel gas pipe not in conflict with project improvements is to be abandoned in place and should not be disturbed." d. Replace the paragraph in Division 1M.27.2.c with the following: "Dominion Energy will remove their existing 4" and 6" gas lines in Main Street, which are believed to be asbestos coated, where they conflict with project improvements. All steel gas pipe not in conflict with project improvements is to be abandoned in place and should not be disturbed. Santaquin City will be holding a new mandatory pre-bid meeting as indicated on the Advertisement Even if one or more of your representatives attended the original pre-bid meeting, your representative still must attend the upcoming, mandatory pre-bid meeting to be considered as a qualified bidder.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects