Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 17, 2024

No Information to Display

N Maple St

Demolition, New Construction, Paving, Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

N Maple St, Fruita, CO

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Reference Number 0000333622 The City of Fruita is requesting Statements of Qualifications from interested consulting firms who can by complete design services for the FRT-17.5-K.25 (Maple Street over Little Salt Wash) Bridge Replacement Project. The scope of work for this project includes: an updated geotechnical investigation, utilities coordination, bridge design, bid document preparation, project bid process and construction administration. All bridge design and construction documents must be prepared according to CDOT standards and specifications. Fruita is funding the project design and there will be CDOT oversight during the design phase of this project, however, it is expected CDOT will review and the plans prior to going out for bid. This bridge has been listed in federal funding options for construction, although the federal funds are not currently guaranteed. The intent is to complete the design in 2024 and secure federal funding prior to completing the bid process and bridge construction in 2025. Job Location Fruita Road Name Maple Street Bridge over Little Salt Wash Length 77 No Pre-submittal meeting is scheduled for this project. The City of Fruita Engineering Department will be available during normal business hours to answer questions related to the project. Access is available to the bridge via Maple Street north of Ottley Avenue for inspection by consultants. General Requirements - Bidder Prequalification/Preregistration Required

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.