Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

January 1, 2024

No Information to Display

Redwood Dr

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Redwood Dr, Los Altos, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Description of Project: The District is seeking environmental consultant services for replacing Webb Creek Culvert and Alma Parking Lot at Bear Creek Redwoods Open Space Preserve. The replacement will likely require an upsize to the existing culvert, and potential modifications to the creek channel. The District is seeking environmental consultant services for replacing Webb Creek Culvert and Alma Parking Lot at Bear Creek Redwoods Open Space Preserve. The replacement will likely require an upsize to the existing culvert, a joining detail of the culvert to a recently repaired section at Bear Creek Road within County of Santa Clara right-of-way; slope stabilization, and replacement parking lot with drainage improvements. Webb Creek Culvert is located at the northeastern area of the preserve and drains from south to north beginning near Skyline Boulevard. The culvert conveys Webb Creek from its inlet on the west side of Bear Creek Road, under the Alma Parking Area, to its outlet on the north side of Alma College Road. November 2, 2023 Deadline by EOD to submit questions to District Representative by email: iyeung@openspace.org November 7, 2023 Addendum issued for questions from Optional Pre-Proposal Tour and submitted emails November - December 2023 Consultant Selection December 2023 - January 2024 Fully Executed Contract / Proof of Insurance / Notice to Proceed February - March 2024 Kick-off Meeting March 2024 65% Design from Design Consultant - Coordination Meeting March 2024 - March 2025 Regulatory Agency Permitting April 2025 100% PS&E Summer 2025 Construction and Optional Biological Monitoring The method of Contractor Selection has not been Determined at this time.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.