Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 1, 2024

October 1, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$200,000,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Avon Park, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Georgia Department of Transportation (Georgia DOT) hereby posts the following Public Notice Advertisement (PNA) for considered services. Georgia DOT intends to solicit responses for design and construction services to construct a new interchange located east of the existing weigh station on Interstate 16 (I-16) which would realign and widen Old Cuyler Road and Cuyler Road over I-16 from two-lanes to fourlanes in Bryan County, GA. A virtual Industry Forum and virtual one-on-one meetings will be conducted for this Project at the dates noted above. During the Industry Forum presentation, Georgia DOT will provide information regarding the Project's delivery goals, anticipated scope, anticipated Design-Build procurement process, and potential risks. There is no limitation on the number of participants. This is a recorded presentation and participants will not be provided the opportunity to ask questions. Any information provided by Georgia DOT shall be considered as informational only and is subject to change. Participants will be able to ask questions during the scheduled one-on-one meetings. Interested parties can preregister here for access to the pre-recorded presentation 24-hours prior to its posting on the Georgia DOT Design-Build website on the date noted above. Include in the email three available 30-minute time slots (ranked in order of preference). Include the name, title, and company of those individuals who will be attending the one-on-one Microsoft Teams meeting with an email address for each individual in order for Georgia DOT to send the login information for attendance. Only provide email addresses of the person(s) who will participate in the Microsoft Teams on behalf of your team, not to exceed six (6) persons. In response, Georgia DOT will send out a meeting invitation including a specified date, time, and secured login information. To ensure confidentiality of the one-on-one meeting, do not forward the meeting invitation. Georgia DOT issues the Notice to Finalists 02/23/2024 ----------- g. Georgia DOT issues Request for Proposals to the Finalists 03/01/2024 ----------- h. Receipt of Proposals from Finalists 06/27/2024 11:00 A.M. i. Georgia DOT letting (opening of Price Proposals) 07/26/2024 11:00 A.M.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.