Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 21, 2023

December 21, 2023

October 16, 2024

Multiple Locations

Site Work

No Information to Display

$220,000.00

Public - City

img_map_placeholder

Multiple Locations, Newark, DE

Subscribe to View Full Documents

It shall be the Contractor's responsibility to furnish the goods and services specifically indicated 23 in the scope of work and specifications and such other as may be required to meet the intent of the specifications, drawings, or as may be necessary to provide the operation intended by the City. The contractor shall furnish all labor, materials (except as noted), equipment, and means to perform tank maintenance on the 1.0 mg waterspheroid known as the louviers tank, the 500,000 gal. Standpipe known as the arbour park tank, and the flatbottom 2.0 mg known as the new london road tank, as listed in this specification. The owner of these tanks is the city of newark, delaware. The lump sum contract price constitutes full payment to the contractor for work to be performed under this contract. When applicable, and authorized by owner, additional work will be paid for in accordance with the supplementary unit price schedule, of the bid. The cost of labor, equipment, materials, or work called for in the specifications, shown on the drawings, or necessary for a complete and satisfactory installation, but which are not specifically mentioned in this specification, shall be performed by the contractor and at no additional expense to the owner. This section covers surface preparation of the interior wet surfaces, followed by the application of the recommended coating system. All questions/requests for information regarding this contract (bid process, drawings, and technical specifications, etc.) must be submitted via email to contracts@newark.de.us by 5:00 p.m. on Tuesday, November 14, 2023, to allow staff sufficient time to develop answers to questions deemed appropriate.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.