Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 1, 2023

March 25, 2024

July 31, 2025

Multiple Locations

Outdoor Lighting, Paving, Site Work

No Information to Display

$450,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Downers Grove, IL

Our team is requesting plans for this project.

Subscribe to View Full Documents

The work to be done under this contract shall be started on or about March 25, 2024. All work under this contract shall be completed by July 31, 2025. The location of services to be performed is on the Elgin O'Hare Western Access (I-490) between Mile Post 5.9 and Mile Post 6.2 in Cook County, Illinois. The scope of the work shall consist of site clearing and removals, earthwork and grading, construction of bridge decks, restoration, and stabilization of a portion of Higgins Creek, pavement construction, shoulders and barriers, drainage systems, signing, roadway lighting, Intelligent Transportation Systems (ITS) Infrastructure, erosion and sediment control, landscaping, and maintenance of traffic. Bidders may be required to be pre-qualified by the Illinois Department of Transportation (IDOT). Joint Ventures shall be limited to no more than three (3) individually IDOT pre-qualified members. Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4676D.4758_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on November 10, 2023. A completed Questionnaire and a statement of current contractual obligations on forms supplied by the Illinois Tollway will be required from the apparent low bidder once the apparent low bidder is determined. Each bid must be accompanied by a Bid Guaranty in the amount of five (5%) percent of the total amount shown in the bid for the contract. The Bid Guaranty shall be in the form of an acceptable bid bond or a bank draft, certified check or cashier's check drawn on a solvent bank made payable to the Illinois State Toll Highway Authority. Award of the above contract, if any award be made, will be to the lowest responsive and responsible bidder or bidders. The Tollway reserves the right to reject any and all bids, to waive technicalities, or cancel the solicitation.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects