Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 17, 2024

No Information to Display

To Be Determined

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

To Be Determined, Arlington, VA

Our team is requesting plans for this project.

Subscribe to View Full Documents

This notice is provided to solicit interest for the Construction Projects Scheduling, Constructability, Risk Management, Litigation, and Forensic Audit Support Services IDIQ's. Awardees will provide The Office of Construction Management (CM), Bureau of Overseas Buildings Operations (OBO), U.S. Department of State support services for Construction Scheduling support, Review and Evaluation of Requests for Equitable Adjustments (REAs), Time Impact Analysis (TIAs), Constructability, Risk Analysis, Claims Mitigation and Cost Estimating services under IDIQ contracts for worldwide OBO's construction projects. Review and analyze IPES, BPES, Monthly PES Updates, REAs, TIAs submitted by the construction contractor. Provide cost estimations for contracts and contract modifications including direct costs, sub-contractors costs, and indirect costs if requested. Review integration of Commissioning Schedules in PES. Provide Claim Mitigation services including claim analysis, expert witnesses and audit of contractors prices. Project site visits if requested and authorized in writing by the COR. Submit detailed narratives and reports for each completed activity. Develop an integrated schedule risk model with the use of simulation techniques, such as Monte Carlo, to project the likely substantial completion date. The updated risk register will contain the probability of each risk identified and a range of days (minimum, most likely, and maximum) the item will affect the overall project schedule. The requirement for 6 simulations to be provided are as described, provide the findings data in a graphic format (MS excel exports or other) for a slide based presentation to OBO prior to the publishing of reports. Provide aprobabilistic distribution model in which a 50% and 80% certainty level represents the likely substantial completion date.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects