Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 16, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$23,992,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Raleigh, NC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Scope of Work The Department of Adult Correction invites experienced design firms to submit qualifications to provide design and construction administration services for the infrastructure and the installation of stun/lethal fencing inside the perimeter fence at Central Prison as well as design and construction administration for the infrastructure and the installation of stun fencing at 4 other correctional institutions (Piedmont CI, Eastern CI, Franklin CI, and Southern CI). These projects involve modifications to the existing perimeter fences, electrical system modifications, installation of the stun or stun/lethal fence components, and software to monitor the fencing. Full Design services (including Surveying) are required and will include all submittal requirements for the State Construction Office for all submittal phases, Cost Estimates updated at each phase with each SCO submittal, with Technical Specifications in Masterspec 2006, bidding services, construction administration services, record drawings in AutoCAD and project closeout as defined by the State Construction Manual (Twelfth Ed.) dated March of 2019.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.