Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 30, 2024

No Information to Display

150 Concord St

Renovation

No Information to Display

$1,450,645.00

Public - City

img_map_placeholder

150 Concord St, Framingham, MA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

This project is included in the City of Framingham fiscal years 2024-2028 Capital Improvement Program (CIP). As of October 23, 2023, further details regarding design and construction have not been identified. A firm timeline for construction has not been established; however, funding is allotted to fiscal year 2024-2025. A detailed scope has not yet been released. The project will done in 2 phases - the first phase being design and second phase being construction. The roof system at Memorial Building was replaced in 1995. We currently have active leaks. All roof areas suffer from improper roof installation and conduit penetrations. In FY21, a reapplication of the protective roof coating over the auditorium was completed. The roof termination into the masonry parapet walls and flashing will need to be re-installed as the current condition continues to pose a risk of leakage and roof system deterioration. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.