Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 21, 2023

July 15, 2024

No Information to Display

137 Bond St

Asbestos Abatement, LEED Certification, New Construction, Site Work

No Information to Display

$8,000,000.00

Public - State/Provincial

img_map_placeholder

137 Bond St, Toronto, ON

Subscribe to View Full Documents

The University is conducting a Request for Supplier Qualifications (RFSQ) for potential proponents to be prequalified to participate in a future second stage procurement for Construction Management services to construct the new Student Wellbeing Centre located at 137 Bond Street. The Project will include the addition of an eight (8) story mass timber tower connected to the existing three (3) story heritage building on the site. The University intends to execute a construction management contract, CCDC 5B - 2010, as amended by the University's Supplementary Conditions, similar to those provided in Appendix E of the RFSQ. The University further intends to sign a guaranteed maximum price contract for the Work at the time of the execution of the Agreement. The Proponent will provide the University with its proposal for a guaranteed maximum price for the performance of the Work through the Second Stage Process. The University is unable to continue into the construction and tendering phase unless the Construction Cost Estimate provided by the Successful Proponent is within its available construction budget. Contract Details The term of the Final Agreement, resulting from the Second Stage Process, is one (1) year beyond the successful completion of the Project plus all warranty terms, as applicable. Successful completion of the Project is estimated to be reached within 18 - 24 months after mobilization of the Successful Proponent, which is expected to occur in Spring 2024. For clarity, this RFSQ Process results in a Prequalified Proponent(s) that will receive a Prequalification Notification only. The Final Agreement follows the subsequent Second Stage Process. The University intends to select a limited number of qualified suppliers to be invited to participate in the subsequent procurement process. The criteria that will be used to prequalify suppliers are set out in procurement documents. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Acceptance Deadline: 2023/11/10 11:00:00 AM EST TIMELINE: The Second Stage Procurement to the prequalified Construction Managers is expected to be posted sometime January 2024; timeline is subject to change.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.