Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
January 15, 2024
No Information to Display
Multiple Locations
Service, Maintenance and Supply
No Information to Display
No Information to Display
Public - City
Multiple Locations, Laredo, TX
Plans and Specifications are not available for this project. If that changes, they will be made available here.
The City of Laredo, Texas is requesting qualifications and a statement of interest for professional Services to conduct a comprehensive water and wastewater rate study, from qualified consultant or consulting firm. Background: The City of Laredo Utilities Department Incorporates automatic water meters for most of its service area with a population of approximately 265,000. The City of Laredo uses surface water from the Rio Grande River as its source of raw water. The two plants in the City of Laredo are Jefferson Water Treatment Plant 65 Million Gallons per Day (MGD) and El Pico Water Treatment Plant 28 MGD for a combined capacity of 85 MGD. The average daily consumption during 2022 was approximately 37.56 million gallons per day and peak demand for 2022 was 53.4 million gallons per day. Connections to the water system as of September 30, 2022 were 79,332. The system consists of approximately 1,161 miles of transmission and distribution lines and 8,976 Fire Hydrants. The City of Laredo owns and operates six wastewater treatment plants, which have a combined total design capacity of 29.19 million gallons per day ("MGD"). The sewer includes approximately 513 miles of sewer lines and 69 lift stations. The average daily treatment is 20 MGD with a peak flow of 39.2 MGD. Connections to the sewer system as of December 31, 2022 were 65,657. The last Wastewater (Sewer) Rate Study was completed in 2018. Scope of Work: The development of the Rate Study must encompass the elements outlined in: 1) The American Water Works Association (AWWA) Manual M1, Principles of Water Rates, Fees, and charges, and 2) The Water Environment Foundation's Wastewater Financing and Charges for Wastewater Systems and should be developed in a similar manner to the existing rates and charges of the City. The firm is to review the City's current rate structure and make recommendations on best practices and be prepares to discuss the pros and cons of each and impacts to the various ratepayer classes. The rate model should equitably distribute costs between water and wastewater and between base and volume or fixed and variable which include comparisons of regional and similar size cities. The study should include analysis by normalizing the comparative rates against the local economics, thereby identifying possible differences in production cost to deliver similar services. The rate study will include information from the City's recent Water and Wastewater Master Plans including a cost to value analysis and funding options for: 1) Secondary water from regional ground water sources as well as; 2) Beneficial Reuse Water and a 'purple pipe' distribution network as a means to conserve the City's domestic potable water supply. Additionally, the study will discuss separate irrigation rates for customers with dedicated irrigation accounts. The firm should inform the City of any upcoming regulatory changes that may affect the City's rate or rate structure. The City is seeking a user-friendly rate model that can incorporate various fees, CIP estimates as developed from the City's Master Plan and corresponding debt components with the ability to make adjustments to these amounts and expenses. Allowing these adjustments to the model should allow for dynamic or scenario modeling to the rate structure thereby calculating bond coverage and cash reserves with flexibility over an 8-year period. RFQ shall be submitted in writing or via email to Michael Rodgers (mrodgers@ci.laredo.tx.us) on or before Friday, November 17. It is expected that the selected consultant should be ready to proceed on or before January 15, 2024.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Laredo, TX
Bid Date: Nov 16 2023
Laredo, TX
--
Laredo, TX
--
Laredo, TX
Bid Date: Dec 02 2022
Laredo, TX
Bid Date: Nov 15 2023
Laredo, TX
Bid Date: Dec 21 2023
Laredo, TX
Bid Date: Jan 10 2024
Laredo, TX
Bid Date: Jan 10 2024
Laredo, TX
Bid Date: Nov 09 2020
Laredo, TX
--
Laredo, TX
--
Laredo, TX
Bid Date: Nov 02 2023
Laredo, TX
Bid Date: Oct 03 2023
Laredo, TX
Bid Date: Oct 19 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
