Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 17, 2025

No Information to Display

Main St

Paving, Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

Main St, Bath, ON

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Bath Main Street Connecting Link Reconstruction. Construction will be phased: Phase 1 - Windermere Intersection Design – Intersection of Windermere Blvd and Bath main street including approaches. Phase 2 - Main Street Bath from the Water plant/Fairfield St to the Windermere Intersection – An approximately 760m long section of Semi Urban Street. Phase 3 - Windermere Intersection to Main Street Bath East Limit. An approximately 750m long section of Semi Urban Street. TIMELINE: An RFP for engineering services to complete survey, design, and tender preparation has been issued by the owner. Updates will be made upon award of contract.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.