Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 14, 2023

January 15, 2024

January 14, 2026

Multiple Locations

Renovation

No Information to Display

$2,000,000.00

Public - County

img_map_placeholder

Multiple Locations, Marietta, GA

Subscribe to View Full Documents

Reference Number 0000332391 Effluent filter improvements for the 12 million gallon per day (mgd) Northwest Cobb Water Reclamation Facility (WFR) and for the 20 mgd Noonday Creek Water Reclamation Facility. Question Acceptance Deadline 11/07/2023 05:00 PM EST Questions are submitted online No Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % -- The successful bidder for this contract will be required to furnish a satisfactory performance bond and and material payment bond, each in the amount of one-hundred percent (100%) of the bid. Owner reserves the right to waive any informality or to reject any or all bids, to evaluate bids, and to accept any bid which in its opinion may be for the best interest of Owner. Any bids submitted that do not include a duplicate of Section 00300 and a copy of the bid bond as specified in the Instructions to Bidders may be rejected. The Project consists of effluent filter improvements for the 12 million gallon per day (mgd) Northwest Cobb Water Reclamation Facility (WRF) and for the 20 mgd Noonday Creek Water Reclamation Facility. The contract time for construction of the project is 730 calendar days (two years). The project consists of the following major items: Northwest Cobb WRF Filter Upgrades: Replacement of four sand filter systems in Filter Basins 1-4 at Northwest Cobb WRF with AquaDiamond cloth media filter systems. Installation of a canopy at Filter Basins 1-4 at Northwest Cobb WRF Upgrades to yard piping into and out of the filter basins as shown on the drawings at Northwest Cobb WRF. Installation of a new plug valve to cut off flow to the existing Filter Basins 5-8 at Northwest Cobb WRF. Installation of new weirs for the filter basins. Demolition and disposal of equipment and materials, as shown on the drawings. Instrumentation and electrical system upgrades to accommodate the above improvements. Concrete crack repair PROJECT LOCATION: 3740 HWY 293 (OLD41) KENNESAW, GA 30144, 415 SHALLOWFORD ROAD KENNESAW, GA 30144

36 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.