Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

December 4, 2024

September 10, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$850,000.00

Public - City

img_map_placeholder

Multiple Locations, Pasadena, CA

Subscribe to View Full Documents

The Avondale Lift Station is located behind the sidewalk along Avondale Road. The Avondale Lift Station improvements include the demolition and disposal of mechanical and electrical equipment at the Avondale Lift Station as outlined in the contract drawings. The improvements also include, but are not limited to; fabrication and installation of two new 10 HP dry-pit submersible pumps and the pumping unit s reinforced concrete pedestal, 4 diameter ductile iron suction piping and gate valves, 4 diameter ductile iron discharge piping, 4 diameter gate and check valves, 4 diameter bypass connection, new sump pump and sump pump discharge piping, installation of a new wet well lining system, rehabilitation of concrete within the wet well, and all electrical improvements as shown on the contract drawings to furnish a complete, operable lift station system following all indicated rehabilitation and improvements. This work also includes required dewatering of existing wet well and facilities to accommodate improvements, furnishing and conducting temporary sewage bypassing during construction, and all startup and testing of new equipment. Project Duration 200 Working Days from Start of Mobilization. Liquidated Damages $950 per calendar day. Start/Delivery Date January 2024 Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00%

32 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects