Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 27, 2023
November 27, 2023
No Information to Display
Moffett Blvd
Service, Maintenance and Supply
No Information to Display
No Information to Display
Public - Federal
Moffett Blvd, Mountain View, CA
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
The Electric Arc Shock Tube (EAST) facility at NASA Ames performs, among other things, spectroscopic measurements in the Vacuum Ultraviolet. This requires the use of specially fabricated crystal windows that are transparent to Vacuum Ultraviolet radiation. These windows are exposed to shock waves of several atmospheres and thousands of degrees for very short (<1 ms) durations. The windows become damaged during this process and must be periodically replaced. There are two materials which meet our transparency requirements down to 120 nm, Magnesium Fluoride (MgF2) and Lithium Fluoride (LiF). Though we have tested with both types of windows in the past, the MgF2 is preferred due to higher cracking resistance and generally lower fabrication and material cost. The form factors for these windows are as specified in NASA drawing number A329-0802-M47. The drawing also specifies machining tolerances and optical performance metrics. The vendor shall verify optical performance prior to delivery of the components. The material is to be optical quality, vacuum ultraviolet grade MgF2. Parts must be free of color centers. The window must be fabricated perpendicular to its optical axis to minimize birefringence and transmission polarization. The table below specifies the minimum transmittance as a function of wavelength. The transmittance should be verified on parts of full form-factor. Transmittance of fabricated windows will be measured by NASA after receipt. Windows not meeting specification will be returned for replacement or full refund, up to 1 year after receipt. f the vendor is unable to meet all of these requirements, in terms of mechanical precision and/or optical quality, relaxed requirements may be considered. In this case, the vendor must provide alternate values for the specifications they are unable to meet. Quantity Because the windows are fabricated from a larger crystal the batch size a vendor can produce may vary. Therefore the vendor may choose to quote for the quantity that is most consistent with their abilities, with the number of windows required being between 4-8. If the vendor anticipates producing test pieces that are near or slightly off-spec during fabrication the quote may also specify a price and quantity for these pieces as an optional add-on to the procurement. Criteria for Selection Primarily, the selection will be based on cost per window. However, considerations will be given for i) higher transmittances, ii) time of delivery, iii) ability to meet or exceed machining and optical tolerances, and iv) availability of additional windows. erformance Period Delivery 3 to 4 weeks after receipt of order S hipping Shipped in container with appropriate protective material P lace of Performance Delivered to NASA Ames
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Mountain View, CA
Bid Date: Feb 01 2024
Mountain View, CA
Bid Date: Sep 24 2024
Mountain View, CA
Bid Date: Sep 30 2024
Mountain View, CA
--
Mountain View, CA
--
Mountain View, CA
Bid Date: Oct 24 2023
Mountain View, CA
Bid Date: Nov 15 2023
Mountain View, CA
--
Mountain View, CA
--
Mountain View, CA
--
Mountain View, CA
Bid Date: Aug 31 2023
Mountain View, CA
--
Mountain View, CA
--
Mountain View, CA
--
Mountain View, CA
Bid Date: Jul 18 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
