Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 3, 2023

December 4, 2023

No Information to Display

To Be Determined

New Construction, Site Work

No Information to Display

$85,000.00

Public - City

img_map_placeholder

To Be Determined, Houston, TX

Subscribe to View Full Documents

Lift Station No. 1: Construction of District SCADA System includes, but is not limited to, removal of the existing Control Panel and installation of new Control Panel at Lift Station No. 1; electrical work including controls, conduit and wire; and all else shown on the contract drawings. Question Deadline 10/31/2023 at 12:00 PM CT In ample time to permit consideration before reply, submit questions about bidding instruments to the Engineer. Questions must be submitted electronically Lift Station No. 2: Construction of District SCADA System includes, but is not limited to, removal of the existing PLC and HMI and installation of new PLC and HMI in the existing control panel, electrical work including controls, conduit and wire; and all else shown on the contract drawings Lift Station No. 3: Construction of District SCADA System includes, but is not limited to, installation of temporary control panel, permanent Automatic Transfer Switch; removal of existing control panel; installation of new control panel with PLC and HMI, electrical work including controls, conduit and wire; and all else shown on the contract drawings Water Plant No. 1: Construction of District SCADA System includes, but is not limited to, installation of a firewall switch in the existing Auto Sensory panel; electrical work including controls, conduit and wire; and all else shown on the contract drawings Water Plant No. 2: Construction of District SCADA System includes, but is not limited to, installation of new firewall switch; electrical work including controls, conduit and wire; and all else shown on the contract drawings Water Plant No. 3: Construction of District SCADA System includes, but is not limited to, installation of new PLC Panel and HMI; modification to existing autosensory panel; electrical work including controls, conduit and wire; and all else shown on the contract drawings Construction of District SCADA System includes, but is not limited to, installation of new PLC Panel and HMI in the existing Electrical Building; installation of new SCADA Server and Workstation; VTSCADA Software License; electrical work including controls, conduit and wire; and all else shown on the contract drawings The bidder shall submit a certified or cashier's check on a responsible bank in the State equal to two percent (2%) cashier's check or five percent (5%) bid bond of the maximum total bid amount. Make the cashier's check or bid bond payable to the Owner The Owner reserves the right to reject any or all bids and waive any or all irregularities

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.