Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

January 8, 2024

May 5, 2024

9th St

Site Work

No Information to Display

$310,000.00

Public - City

img_map_placeholder

9th St, Terrell, TX

Subscribe to View Full Documents

Project will consist of clearing the drainage corridor starting at Ninth Street and extending southward to approximately 150 feet south of Grace Lane, for a total of about 876 feet. The drainage channel will be restored including about 290 feet of concrete-lined channel. The existing pipe culvert beneath Grace Lane will be replaced with double 30-inch diameter reinforced concrete pipe culvert with headwalls and wingwalls. Project will include clearing and regrading approximately 900 LF of drainage corridor, concrete lining approximately 290 LF of channel, and replacing a drainage culvert beneath Grace Lane If you should have any questions regarding this Invitation to Bid and/or the specifications, please direct them to Frank Stephens, P.E., with SPI at 903-262-9937.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.