Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

December 18, 2023

August 16, 2024

Multiple Locations

Renovation

No Information to Display

$60,000.00

Public - City

img_map_placeholder

Multiple Locations, Tampa, FL

Subscribe to View Full Documents

WYANDANCH MEMORIAL HIGH SCHOOL52 S. 32nd Street, Wyandanch, NY 11798 SED# 59-01-09-02-0-004-025 MILTON L. OLIVE MIDDLE SCHOOL 140 Garden City Avenue, Wyandanch, NY 11798 SED# 58-01-09-02-0-005-025 LAFRANCIS HARDIMAN & MRTIN L. KING ELEMENTARY SCHOOLS 792 Delores E. Jenkins Avenue, Wyandanch, NY 11798 SED# 58-01-09-02-0-002-032 Each proposal submitted must be accompanied by a certified check or bid bond, made payable to the "WYANDANCH UNION FREE SCHOOL DISTRICT", in an amount equal to five percent (5%) of the total amount of the bid, as a commitment by the bidder that, if its bid is accepted, it will enter into a contract to perform the work and will execute such further security as may be required for the faithful performance of the contract. Upgrades at Wyandanch Memorial High School, Milton L. Olive Middle School, and LaFrancis Hardman & Martin L. King Elementary Schools A. Furnish all labor, equipment, materials, tools, means, methods, and incidentals necessary to complete the Work as required by the Contract Documents for this Construction Contract. Each contractor shall coordinate, through the Owner/Architect/Engineer, the work of their contract with the work by others. B. This following abbreviated summary is provided in order to briefly describe the work covered by the Contract Documents for this Construction Contract. It is not all inclusive of the work under the Contract. C. The work includes, but is not limited to, the following: 1. Startup participation for the various equipment and systems of the project and provide complete service to troubleshoot and assist manufacturer service representatives in obtaining a completely functional installation. 2. New grilles, registers, duct work, supports and accessories. 3. New air conditioning systems. 4. New ventilation systems. 5. Equipment supports, dunnage, and structural alterations. 6. Ductwork, piping, valves, fittings, dampers, louvers, etc. 7. Roofing, penetration sealing, and weatherization. 8. Patching, painting, and finishing work. 9. Equipment controls and BMS integration. 10. Testing and balancing of systems. 11. Project closeout submittals. For information with reference to the work and its location during bid phase by prospective bidders' questions shall be submitted in writing to: H2M architects + engineers Shannah Sherman-Corrado, P.E., C.E.M, Senior Project Engineer 538 Broad Hollow Road Melville, New York 11747 Phone: (631) 756-8000 Ext. 1509 Fax: (631) 694-4122 e-mail: ssherman@h2m.com Question Deadline 10/28/2023

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.