Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 16, 2023

December 11, 2023

March 30, 2024

1664 N Virginia St

Renovation

No Information to Display

$160,500.00

Public - State/Provincial

img_map_placeholder

1664 N Virginia St, Reno, NV

Subscribe to View Full Documents

Description of Work: This is a prevailing wage project. Extend 25kV conductors to existing vault and switch PMS 25-19 at the southeast corner of the building. Purchase a new switch. A. The work of the contract involves but is not limited to the installation of the following. 1. Demolition of medium voltage cable. 2. Demolition of above ground raceway systems. 3. Demolition of existing pad mount 25kV switch. 4. Furnish and install contractor furnished medium voltage conductors in EXISTING raceway systems. 5. Termination & splices of medium voltage conductors. 6. Electrical Systems testing and commissioning. B. Contractor shall at all times conduct his/her operations as to insure the least inconvenience to the general public and the Universities business. 1. Shutdowns of power shall be done on Saturdays. Contractor is responsible for overtime pay. C. Sequencing of the work must be completed according to the Sequence of Anticipated Construction Phasing UNR Project#: #24MNC02714 Labor Commissioner #: WA-2024-056 SPWD Project #24-B009 Estimated Cost Range: $125,500 to $160,500 Liquidated Damages: $500/day Nevada Electrical Contractors License and provide documentation of certifications for all electricians performing 25kV terminations. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 11/2/2023 05:00:00 PM (PT) Questions regarding this solicitation must be in writing and submitted via the Questions Tab Completion of Work: Subject to change by Owner, Work is scheduled to begin on "December 11, 2023" and shall be fully complete by "March 30, 2024."

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.