Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 3, 2024

No Information to Display

W State St

Site Work

No Information to Display

$655,000.00

Public - City

img_map_placeholder

W State St, Marshalltown, IA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The State Street Reconstruction project from 3rd Ave to 3rd St is installing storm sewer. The engineers did not budget or plan to outlet the new storm sewer outside of that 6 blocks of reconstruction. The new storm sewer is larger diameter and at a lower elevation than what it is connecting to. This will cause the storm sewer to fill with debris and be unable to stay clean. Its operation will be based on out letting only under surcharged conditions. This project would extend storm sewer to replace existing storm sewer so that the elevation of the new storm sewer would match up with existing storm sewer infrastructure. While the size of the new storm sewer will be larger, this project will at least line up the flow-lines of the storm sewer to prevent the debris build up and constant maintenance need that would be required if left unchecked. Conceptual Cost Estimate prepared by City Engineering 08/2022 - $475,187.60 Budget 6% / Yr Inflation (x3 Years) & 20% contingency = $655,000 Design Engineering est @ 8% or $55,000 City would cover Construction Engineering with in-house staff. This project is included in the city’s fy 2023-2027 Capital Improvement Program. As of October 23, 2023, further details regarding design and firm construction timelines. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.