Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 13, 2023

March 18, 2024

November 30, 2024

Multiple Locations

Outdoor Lighting, Site Work

No Information to Display

$3,800,000.00

Public - City

img_map_placeholder

Multiple Locations, Geneva, IL

Subscribe to View Full Documents

The project will consist of the abandoning of old cable and the installation of primary cable through conduit in two locations in Geneva. Please see related documents for complete details. The abandoning of old cable and the installation of primary cable through conduit in two locations in Geneva. The installation of new conduits (poly, pvc & rigid), primary cable, splicing etc to replace existing feeder and distribution circuits. Feeder circuit replacement along Geneva Drive as well as on S 3rd Street. Each Bid must be accompanied by a Bid bond signed by a Surety company authorized to do business in Illinois, or by a cashier s check or certified check in the amount of ten (10) percent of the base Bid. substantial completion date of November 1, 2024. Landscaping is to be completed by November 30, 2024. The City of Geneva, IL reserves the right to reject any or all Bids and waive technicalities. Bidders will be required to comply with all applicable statutes, regulations, Federal and State laws, local laws and ordinances, etc., including those pertaining to the licensing of Contractors, and the so-called Kickback Statute (48 Stat.948) and regulations issued pursuant thereto. Bidder will also be required to comply with rules and regulations of the City of Geneva, IL, in which city these improvements are located. The successful Bidder will be required to compute three additional counterparts of the Proposal and to furnish a Contractors Bond (Performance and Payment) in triplicate in the form attached hereto with sureties listed by the United States Treasury Department as Acceptable Sureties, in a penal sum not less than the Contract price. The Owner reserves the right to reject any or all Proposals, and to accept the Proposal which in its opinion is in the best interest of the Owner. The attention of Bidders is specially called to the desirability of a proper balance between prices for labor and materials and between the total prices for the respective Construction Units. Lack of such balance may be considered as a reason for rejecting a Proposal. Any questions relating to the Contract that requires a response from the City of Geneva must be submitted in writing (email, fax or mail) by Tuesday, November 7, 2023 at 9:00 a.m. The City of Geneva will provide response by email by Thursday, November 9, 2023 at 9:00 a.m. No further Addendum will be made after this point in time.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects