Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

December 1, 2023

December 18, 2023

726 Hack Wilson Way

Renovation

No Information to Display

$250,000.00

Public - County

img_map_placeholder

726 Hack Wilson Way, Martinsburg, WV

Our team is requesting plans for this project.

Subscribe to View Full Documents

For more information about the project, please contact Ty Tyson, BCS Director of Facilities, ptyson@k12.wv.us. The Berkeley County Board of Education reserves the right to reject any or all bids and to waive any informalities in the bidding process. Proposal Evaluation and Award of Contract All proposals satisfying the requirements of this RFP will be evaluated to establish which of the bidder's best fulfills the needs of the Owner and this project. There will be a maximum of one week of evaluation by the Owner, after which all bidders who submitted a complete proposal will be notified of the results. This RFP does not commit the Owner to award a contract, to pay any costs incurred in the preparation of the proposal or to contract for the goods and/or services offered. The Owner reserves the right to accept or reject any or all proposals received as a result of this request, to rescind this RFP, if it is in the best interests of Owner to do so. An award will be made in the best interest of the Berkeley County Board of Education. The decision of Berkeley County Board of Education shall be final. Project Completion System must be installed by 12/18/23. Start-up and staff training should occur prior to 12/20/23 44 Classrooms / Replacing BOGEN head-unit paging console at Berkeley Heights Elementary School OVERVIEW: INSTALL VALCOM OR EQUIVALENT PAGING EQUIPMENT. 44 CLASSROOMS / REPLACE HEADUNIT PAGING CONSOLE / ADD CALL-SWITCHES TO EA. OF THE 44 - CLASSROOMS A) INSTALL 1 SERVER RACK IN THE MAIN OFFICE AREA WHERE THE BOGEN HEAD-UNIT IS CURRENTLY LOCATED / MOUNT RACK TO BACK WALL ON EITHER SIDE (DETERMINED BY INSTALL TEAM) B) INSTALL 4 TALKBACK - GATEWAYS C) INSTALL 42 EMERGENCY CALL SWITCHES WITH INPUTS WITH WIRING D) INSTALL 1 AMPLIFIER FOR 4 - OUTDOOR EXTERIOR SPEAKERS E) INSTALL 42 WIREMOLD SINGLE GANG BOXES IF DEEMED NECESSARY F) INSTALL CONDUIT AND WIREMOLD WHERE APPLICABLE/NEEDED G) 44- CAT 5 CABLE RUNS H) 44 2X2 LAY IN CEILING SPEAKERS I) INSTALL CEILING T-BARS (AS CEILING IS 2X4 TILES) J) PROVIDE CONTINUED TECHNICAL SUPPORT TO PRINCIPALS & STAFF AS NEEDED K) PRINCIPAL & V.P. BOTH HAVE REQUESTED DESKTOP MICS - INSTALL 2 V-400 (OR SIMILAR) DESKTOP MICROPHONES NOTE: USE ONE PORT TO ACCOMMODATE THE PRINCIPAL & V.P. DESKTOP MICROPHONES L) INSTALL 2 MICROPHONE ADAPTERS M) INSTALL 2 RECEPTACLE MOUNT POWER SUPPLY / HOME-RUN ONE CABLE 18/2 WIRE FROM SERVER TO PRINCIPAL'S OFFICE

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects