Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 24, 2024

March 22, 2024

January 16, 2025

1515 Cherry Hill Rd

Renovation

No Information to Display

$2,500,000.00

Public - State/Provincial

img_map_placeholder

1515 Cherry Hill Rd, Baltimore, MD

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

24

Subscribe to View Full Documents

This Contract is for the roof replacement and renovation of MTA Light Rail storage building located at 1515 Cherry Hill Road in Baltimore, Maryland. The purpose of this project is a complete roof replacement and structural rehabilitation of the building that includes but not limited to: 1. Removal of the existing roofing system and replacement of any damaged roof deck; 2. Providing new single ply membrane roofing system with new tapered rigid insulation sloped 3/8" per foot; 3. Improving roof drainage by replacing existing drains and adding new overflow drainage system, new gutters and downspouts; 4. Creating roof expansion joint; 5. Removing and rebuilding the existing masonry parapets with a bond beam integrated with top courses of the existing CMU wall; 6. Adding structural steel wall reinforcement and creating new expansion joints in exterior masonry walls; 7. Repair cracks in the existing exterior masonry walls; 8. Replacement of the entrance canopy roof assembly. See Special Provisions for details. Project Cost Class : D - $1,000,000 to $2,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Each bid exceeding $100,000 must be accompanied by a Bid Bond on a form furnished by the Administration in the amount of five percent (5%) of the Bid Price. A performance and payment bond is required for all construction contracts in excess of $100,000. The performance bond shall be in an amount equal to one hundred percent (100%) of the contract price. The payment bond shall be in an amount equal to one hundred percent (100%) of the contract price. MBE Participation (%) 19.61 Questions regarding the work should be directed in writing to Christie Williams at CWilliams@mdot.maryland.gov. Questions concerning this solicitation must be received no later than 11/17/2023 at the close of the business day. No interpretations other than written shall be binding on the Administration.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects