Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 9, 2024

No Information to Display

Multiple Locations

Renovation

No Information to Display

$100,000,000.00

Public - Federal

img_map_placeholder

Multiple Locations, Norfolk, VA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

10/26/2023: Revision made to the attachment to remove the second sentance from question #6 as it is not applicable. The citywide, Norfolk CSRM Program is split into five (5) implementation phases. Phase 1 covers the downtown Norfolk area which extends from Ghent through Downtown Norfolk, connecting to the Ohio Creek Watershed project, which is split into Phases 1A and 1B, and Phase 1A is split into two acquisitions: (1) Phase 1A - Pump Stations and Tide Gate (DB) and (2) Phase 1A - Wall/Levee and Living Shoreline (Design-Bid-Build (DBB)). This Stand Alone, "C" Type Contract is intended to cover Phase 1A - Pump Stations and Tide Gate (DB) from Berkley Bridge to Campostella (excluding the Casino parcel) as shown in Figure 1 below. The scope may include, but is not limited to, new construction of a tide gate, sliding or swinging gate closures, and pumps stations with required utility relocations and installation for the noted areas. The Contractor shall be required to perform all work in accordance with the access and security requirements of the customer. This contract will cover DB construction and is anticipated to have a construction duration of 1,825 calendar days (5 years) from Notice to Proceed. Please see attached document for more project information. the Magnitude of Construction is between $25,000,000 and $100,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.