Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 4, 2023

March 3, 2024

21 Eric Dawe Dr

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

21 Eric Dawe Dr, Bay Roberts, NL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Closing Time: 2:30 PM (NT) ** Please note that there has been 1 addendum issued for this project. ** The Newfoundland & Labrador English School District invites tenders for the Supply and Installation of Gym Flooring at Amalgamated Academy in Bay Roberts, NL. SUPPLY AND INSTALL NEW FLOOR - GYMNASIUM Remove existing base and replace with new standard black four (4) inch vinyl base. Vinyl base is to be installed as per the manufacturer's instructions. Remove existing sheet sports flooring and discard from site. Prepare and level the sub-floors as per the attached master specifications (NLESD-23-234- Master Specifications.pdf) and all requirements of the flooring manufacturer. In the case of conflict in the in the installation procedure between the master specifications and the requirements of the flooring manufacturer, precedence will be given to the manufacturer' guidelines, subject to prior approval of the owner. Floor sockets are to be level with the new sports floor. Please note that it is the responsibility of the contractor to supply any required spacers and/or perform whatever machine work required to level the sockets with the floor. This includes, but is not limited to grinding or adding spacers. The contractor must ensure that upon completion, the sockets must be of acceptable appearance and functionality. For approximate floor sizing, please refer to NLESD-23-234-Amalgamated Academy Gym Floor Sketch.pdf Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects