Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 16, 2024

March 18, 2024

June 30, 2025

Multiple Locations

Asbestos Abatement, Demolition, Site Work

No Information to Display

$10,000,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Grand Prairie, TX

Subscribe to View Full Documents

The project scope includes, but is not limited to, the following major work items: 150 linear feet (LF) of 36-inch gravity wastewater line by other than open-cut; 565 LF of 36-inch gravity wastewater line by open-cut; 15 LF of 30-inch gravity wastewater line by open-cut; 110 LF of 24-inch gravity wastewater line by open-cut; FRP Fitting Arrangement to connect to 72-inch gravity pipeline; Decommissioning of three (3) Lift Stations; and Lead paint and asbestos abatement. Estimate: 5-10M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The deadline to ask questions is 12/21/2023 11:59 PM CST.

89 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.