Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

December 11, 2023

April 15, 2024

Alamitos Rd

Site Work

No Information to Display

$175,000.00

Public - County

img_map_placeholder

Alamitos Rd, San Jose, CA

Subscribe to View Full Documents

Habitat restoration dry seeding and habitat restoration planting and maintenance. Bridge No 37C0159 (New Bridge No. 37C0603) Question Deadline 11/02/2023 at 4:00 PM PT Questions submitted online: Yes Within 10 working days after Notice of Award, Contractor may submit a request for authorization of date Contractor plans to start job site activities, falling within 40 working days after Notice of Award. This start date will be the first charged day of contract. Upon receipt of Notice to Proceed, Contractor will use any remaining time before first charged day to finalize subcontractor contracts, develop and submit the schedule, and submittals for long lead items. Except for measuring controlling field dimensions and potholing/locating signal poles, do not start job site activities until the authorized requested start work date. Once a Notice to Proceed is issued, Contractor may start job site activities before authorized date if a notice is submitted 72 hours before starting If Contractor obtains authorization to start job site activities for the requested date, start job site activities on the requested date. If Contractor fails to submit a request for authorization to start job site activities as specified above or if the request is not authorized, first charged day shall be 15 working days after receiving Notice to Proceed or 40 working days after Notice of Award (whichever is earlier). However, if Contractor fails to provide Notice to Proceed documents as specified above, the first charged day shall then be 21st work day following the Notice of Award, regardless of authorized start date. Number of working days is to be considered all working days starting from first charge day to completion of project. Contractor shall submit a request in writing to the Project Engineer for all non-working days. The Project Engineer will review then approve or deny the request depending on project circumstances.

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.