Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 15, 2023

December 11, 2023

May 31, 2024

2701 Fairview Rd

Asbestos Abatement, Demolition, Renovation, Site Work

No Information to Display

$850,000.00

Public - State/Provincial

img_map_placeholder

2701 Fairview Rd, Costa Mesa, CA

Subscribe to View Full Documents

Scope of Services o AREA A: Demo Women's Locker Room & Pool o Exterior Abatement as identified in the hazardous materials report and abatement specifications o Interior Abatement of Pool Equipment (Underneath Bleachers) as identified in the hazardous materials report and abatement specifications o Demolition of existing Pool as shown in the plans and specifications o Demolition of the Women's Locker Room as shown in the plans and specifications o Cap and removal of existing underground utilities as shown in the plans and specifications o Installation of owner furnished substation, including trenching, backfill and new concrete and asphalt o Replace existing electrical vault o Installation of new gas-fired water heater and expansion tank, including rerouting of utilities o Installation of new utilities as shown in the plans and specifications o AREA B: Exterior Abatement and Demo Bldg 71 & 72 o Exterior Abatement as identified in the hazardous materials report and abatement specifications o Demolition of existing buildings o Installation of owner furnished transformer and switchboard o Relocate and refeed light poles as shown in the plans and specifications o Reroute existing utilities as shown in the plans and specifications Building 80 is EXCLUDED from the scope of work and should NOT be included in the bid amount. Bid amounts must be separated by Area A and Area B. The District may award both aread or either Area A or B depending on budget. Bid Bond - 10.00% Payment Bond - 100.00% Performance Bond - 100.00% Bid Valid - 60 days Liquidated Damages - $2,500/day Start/Delivery Date - December 11, 2023 - May 31, 2024 Project Duration - 172 Calendar days It is anticipated that the project construction Phase I will commence on December 11, 2023 and be complete by May 31, 2024. Question Deadline 11/09/2023 at 12:00 PM PT Online Q&A - Yes

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.