Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

December 8, 2023

February 6, 2024

700 S Arch St

Renovation

No Information to Display

$200,000.00

Public - City

img_map_placeholder

700 S Arch St, Hannibal, MO

Subscribe to View Full Documents

This contract includes but is not limited to the following items of work, which are listed for the convenience of the Contractor in understanding the intended scope of work: 1. The surface preparation and application of a High Performance Coating System and Polyurethane Lining for the concrete and steel components in contact with the wastewater for Clarifier #3. 2. All items incidental to total completion. The Proposal shall be accompanied by a certified or cashier's check drawn on a solvent Missouri bank or trust company made payable to the HANNIBAL BOARD OF PUBLIC WORKS, or a Bid Bond issued by a surety licensed to conduct business in the state of Missouri and appearing on the U.S. Treasury Department's most current list (Circular 570, as amended), in the amount of not less than five percent (5%) of the total bid. The Bid Bond may be retained by the HANNIBAL BOARD OF PUBLIC WORKS, as a guaranty that if the Proposal is accepted, the bidder will execute the Contract and file an acceptable Performance Bond and Payment Bond within fifteen (15) days after the award of the Contract. This project will be advertised at least twenty four (24) calendar days before the receipt of bids Bidders on this Work will be required to comply with the Copeland (Anti-Kickback) Act. and the Contract Work Hours and Safety Standards Act. as indicated in the Contract Documents. The Contractor doing the work must pay for labor at rates not less than those certified pursuant to Section 290.210- 340, RSMo. (1986) by the Missouri Department of Labor and Industrial Relations as indicated by the schedule included in the Contract Documents. The Contractor shall forfeit as a penalty to the City. Ten and 00/100 Dollars ($10.00) for each workman employed, for each calendar day. or portion thereof, such workman is paid less than the said stipulated rates for any work under said Contract by him or by any subcontractor under him. Section 290.250. Bidders on this work will be required to comply with the President's Executive Order No. 11246. The requirements for Bidders and contractors under this order are explained in the Specifications. The award of Contracts on this project shall be predicated upon competitive bidding, with award being made to the lowest resoonsive. resoonsible bidder. Said lowest Bidders shall be determined for the Contract by summarizing the applicable low base bids. The HANNIBAL BOARD OF PUBLIC WORKS reserves the right to reject any and all bids and to waive all informalities in the bids. No bids may be withdrawn for a period of sixty (60) days subsequent to the specified time for receipt of bids

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.