Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

January 1, 2025

June 1, 2026

10 Sikome Cir SE

Renovation

No Information to Display

$5,000,000.00

Public - State/Provincial

img_map_placeholder

10 Sikome Cir SE, Calgary, AB

Subscribe to View Full Documents

Refurbishment of the Sikome Aquatic Facility in Fish Creek Provincial Park. Upgrade to the Sikome Aquatic Facility. The Scope of the Sikome Aquatic Facility refurbishments shall Support future program offerings and Respond to current and future recreation trends and Offer more for the visitor experience. The scope of the project includes improvements to ease of operation and maintenance efficiencies. Expansion of back of house requirements to achieve daily operational requirements (expanded storage areas, administrative space, designated staff areas, IT requirements, etc.). Improve the flow of traffic, facilitate public transit and thoughtfully connect to the future Central Corridor Pathway immediately north of the facility. Improvements to the entryway for accessibility and to achieve a sense of arrival at each gateway (north and south). Modernize buildings to support future use. Upgrade infrastructure to improve building and site function, and Support emergency protocol and egress. TIMELINE: A Request For Proposals for Engineering and Construction Administration Consultant Services has been issued by the Owner. T There are two primary goals for this project: (1) Using the Sikome Aquatic Redevelopment Plan as a guiding document, consult with Alberta Parks (Kananaskis Region and Capital team members) to develop a Final Conceptual Report to confirm program offerings and inform detail design. This Report will be circulated internally to Alberta Parks as a Decision Document for approval by Capital and Regional Managers / Directors. (2) Following approval of the Decision Document, develop multiple tender packages (assume three) and manage phased construction implementation for Refurbishment of the Sikome Aquatic Facility. Further update pending award of contract. *Budget is unreleased.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.