Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 17, 2023

December 18, 2023

August 14, 2024

To Be Determined

New Construction, Renovation, Site Work

No Information to Display

$700,000.00

Public - City

img_map_placeholder

To Be Determined, Palm Coast, FL

Subscribe to View Full Documents

Ref. #: ITB-SWE-24-01 Intent to Bid Due Date: Nov 16th 2023, 2:00 PM EST Any questions concerning the intent, meaning and interpretations of the bid documents including the draft agreement, shall be requested in writing through the City's Procurement Portal Failure to do so shall result in rejection of the bid submittal as unresponsive. The Work consists of the construction of a new sludge dewatering building, installing sludge dewatering presses, sludge feed pumps, polymer feed system, filtrate pumping system, all association piping and fittings, and all associated electrical and control systems. The contractor shall furnish all labor, material, equipment, tools, supervision, and any other items required for the construction of the Palm Coast Wastewater Treatment Facility No.1 Biosolids Dewatering System. Total construction time to achieve Substantial Completion for the Project is one hundred and eighty (180) consecutive calendar days from the date of the "Notice to Proceed," with an additional sixty (60) consecutive calendar days to achieve Final Completion. A Bid Bond shall accompany each Bid if the Bid amount is one-hundred thousand dollars ($100,000) or greater. The Bid Bond shall be for an amount not less than five percent (5%) of the Bid price and shall be made payable to the City as a guarantee that the Bidder will not withdraw his/her Bid for a period of one hundred twenty (120) days after the Bid closing time. In the event the Contract is awarded to the Successful Bidder and will enter into a written Agreement with the City and furnish a Payment Bond and Performance Bond in an amount equal to the Contract Price. The Material and Workmanship Bond shall be in an amount equal to ten percent (10%) of the Contract Price as adjusted on the Final Application for Payment. The Bidder will forfeit their Bid Security if they fail to do so. All Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida.

40 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects