Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 20, 2024

October 31, 2031

Multiple Locations

Demolition, New Construction, Paving, Site Work

No Information to Display

$395,000,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Salisbury, VA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Number C00116201DB126 Project: I-81 CIP MM 143 to Exit 150 Widening The Project is located along Interstate 81 between approximately Mile Marker 143.0 in Roanoke County and approximate Mile Marker 151.7 in Botetourt County Virginia. The project adds a third lane to northbound and southbound I-81 beginning near the Exit 143 interchange and ending north of the Exit 150 interchange. The total project length is approximately 8.7 miles. Project improvements include, but are not limited to, the following: an additional lane on both northbound and southbound Interstate 81; two bridges replaced over Route 1836 (Belle Haven Road); two bridges replaced over Route 648 (Reservoir Road); two bridges replaced over Tinker Creek and Norfolk Southern Railway; two bridges replaced over US Route 220 (Roanoke Road); addressing vertical clearance concerns for the bridge on Route 115 (Plantation Road) over I-81 by ensuring 16'6" vertical clearance; resurfacing of existing asphalt pavement; resurfacing, repairing, rehabilitating, and/or removing of existing concrete pavement; and the installation of sign structures, storm drain pipes, stormwater management facilities, signals, partial interchange lighting, and noise barriers. VDOT's current estimated contract value for this Project is approximately $395,000,000. 3 Deadline to submit questions 11/01/2023 at 4:00 PM (prevailing local time) VDOT - RFQ Engineering D/B - I-81 CIP MM 143 to Exit 150 Widening

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects