Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 4, 2023

January 18, 2024

Sand Creek St

Paving, Site Work

No Information to Display

$550,000.00

Public - State/Provincial

img_map_placeholder

Sand Creek St, Boise, ID

Subscribe to View Full Documents

A Public Works Contractors License for the State of Idaho is required of the successful bidder at the time of bid opening if total bid is equal to or greater than $50,000. Include names and Public Works License number on Sub-Contractor List as part of bid if total project value is greater than $50,000. The project consists of removing and disposing of the existing wood frame pedestrian bridge; constructing concrete abutments for a new steel frame bridge; and placement of the new steel frame bridge. SPECIAL NOTE: This project is being advertised and bid prior to receiving a pending approval. Therefore, the contract award and start date will be contingent upon receipt of that pending approval. Contact Tom Talley, P.E. at 208-287-2845 for more information.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.