Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

November 1, 2023

April 29, 2024

Grant Line Rd

Site Work

No Information to Display

$992,400.00

Public - City

img_map_placeholder

Grant Line Rd, Rancho Cordova, CA

Subscribe to View Full Documents

The work generally includes furnishing all labor, materials and equipment to install traffic signals, signal control equipment, pedestrian control equipment, loop detectors, additional signing and stripped need for signals and pedestrians, and any other work identified on the improvement plans. The Contract time is one hundred eighty 180 CALENDAR DAYS. Any work completed after the contract time is subject to liquidated damages for delayed completion at a rate of $1,000 per day. Contractor shall mobilize and start underground work on November 1, 2023 or within three (3) days from contract signing, whichever is later. Contractor shall install pre-ordered street light pole within forty-five (45) days upon delivery by supplier. BID SECURITY: A bid security must be provided with each bid. Bid security must be in an amount of not less than ten percent (10%) of the total amount of the Bid for bid and must be cash, a certified check or cashier's check drawn to the order of Woodside, or a Bidder's Bond executed by a surety satisfactory to Woodside on the form provided in the Proposal section of these Contract Documents. BUSINESS LICENSE: The Bidder to whom an award is made must comply with all of the requirements of the City of Rancho Cordova License Ordinance, where applicable, prior to beginning Work under this Contract and at all times during the term of this Contract. Submit all Requestsfor Information (RFI) during the bid period to Steve Leung at Wood Rodgers (sleung@woodrodgers.com).

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects