Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

January 1, 2024

August 1, 2024

2201 N 50th St

Renovation

No Information to Display

$1,000,000.00

Public - City

img_map_placeholder

2201 N 50th St, Fort Smith, AR

Subscribe to View Full Documents

The scope of the work shall include the general listings as shown below in addition to which this contractor shall furnish and install all required pipe, fittings, valves, hangers, supports, sleeves, insets, traps, and other such equipment, items, and appurtenances as may be required for a complete and operative system or systems, including all parts auxiliary to the system or systems whether or not specifically set forth herein and/or shown on the Drawings. Bid proposals must be accompanied by a bidder's bond or cashiers check in the amount of five percent (5%) of the bid, made payable to the Fort Smith School District, Fort Smith, Arkansas, A 5% bid bond or a certified check in the amount of 5% of the bid shall accompany all bids submitted on projects that exceed $35,000 The successful bidder's security will be retained until he has signed the Contract and furnished the required Labor and Materials Payment and Performance Bond. The Agreement will include a stipulation that the Work be completed in a period of time established in the Bid Form. The Agreement will also include a stipulation that liquidated damages will be established in the amount as indicated on the Bid Form per calendar day for each calendar day after the completion date that the Work is not fully completed and the Owner is unable to occupy and utilize the new construction. The Owner reserves the right to waive any informality, or to reject any or all bids.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects