Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
November 16, 2023
December 18, 2023
July 25, 2024
155 Ag-Quad Ln
Renovation
No Information to Display
$200,000.00
Public - State/Provincial
155 Ag-Quad Ln, Blacksburg, VA
The project is generally described as: The removal and installation of new flashing at window heads, copings, and roof to wall interface, repointing of select Hokie stone masonry, the repair of cast stone elements, and the replacement of damaged interior window lintels of Seitz Hall. All equipment, materials, labor, and services necessary for the installation of complete systems shall be provided. The Owner may at any time, by written order utilizing the Change Order (CO-11) and without Notice to the sureties, make changes in the Work which are within the general scope of the Contract, except that no change will be made which alone will increase the total Contract Price to an amount more than twenty percent (20%) in excess of the original Contract Price without Notice to sureties. At the time of the Preconstruction Meeting described in Section 50(b), the Contractor and the Owner shall advise each other in writing of their designees authorized to accept and/or approve Change Orders and of any limits to each designees authority. Should any designee change or the limits of their authority change, the party initiating such change in designee or authority shall give written Notice to the other Party and the A/E within seven (7) Days. Any bid (including the Total Base Bid plus all Additive Bid Items) which exceeds five hundred thousand dollars ($500,000) shall be accompanied by a Commonwealth of Virginia Standard Bid Bond, Form CO-10.2, payable to the Owner as obligee in an amount equal to five percent (5%) of the amount of the bid (the Bid Bond). Plans and Specifications dated October 13, 2023 Question Deadline 11/01/2023 at 2:00 PM ET The Owner reserves the right to reject any or all bids. Completion of the entire project shall be 190 consecutive calendar days from the date of commencement of the Work as specified in the Notice to Proceed, and Final Completion shall be achieved within 30 consecutive calendar days after the date of Substantial Completion as determined by the A/E.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Blacksburg, VA
Bid Date: Oct 23 2023
Blacksburg, VA
Bid Date: Oct 24 2023
Blacksburg, VA
Bid Date: Feb 06 2024
Blacksburg, VA
Bid Date: Oct 01 2024
Blacksburg, VA
Bid Date: Apr 05 2023
Blacksburg, VA
Bid Date: Nov 28 2023
Blacksburg, VA
Bid Date: Nov 17 2023
Blacksburg, VA
Bid Date: Nov 17 2023
Blacksburg, VA
Bid Date: Oct 26 2023
Blacksburg, VA
--
Blacksburg, VA
Bid Date: Jun 29 2023
Blacksburg, VA
Bid Date: Apr 05 2023
Culpeper, VA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
