Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 4, 2023

January 18, 2024

To Be Determined

Site Work

No Information to Display

$280,000.00

Public - County

img_map_placeholder

To Be Determined, Ocala, FL

Subscribe to View Full Documents

Watermain Extension For more info call 352-671-8444. Extend approximately 1,920 LF of 8-inch water main in the Silver Springs Shores subdivision to close loops and provide water service and fire flow. Question Deadline 10/24/2023 at 12:00 PM ET For questions relating to this bid, contact: Shari.Chinevere | shari.chinevere@marionfl.org Marion County is soliciting fully licensed and qualified firms to submit bids for the SWL042 Water Main Extension project. The project is located in the southeast quadrant of Marion County, Florida. The successful bidder will be responsible for all permits unless stated otherwise within this document and must be licensed by Marion County and State of Florida to perform such work. Project Manager for this project is Brian Nabbie, and the Project Engineer of Record (EOR) for this project is Mark W. Thomas, P.E. of Marion County Utilities. Successful bidder must be licensed for this type of work and must submit a copy of such license upon award of bid. All local codes and State of Florida ADA Code will apply. All work must be done by experienced trades. The list of activities shall include but not be limited to: 1.3.1.1. Compliance with maintenance of traffic as per FDOT manual 1.3.1.2. Compliance with permit requirements from FDEP and MCTD 1.3.1.3. Notifications to residents and property owner association (if applicable) 1.3.1.4. Coordination of shutdown activities and Boil Water Notices (if applicable) with the County representative 1.3.1.5. Pressure test as required by FDEP permit 1.3.1.6. Bac-T tests as required by FDEP permit 1.3.1.7. Geotechnical Reports for all road cuts as required by the MCTD permit 1.3.1.8. Backfill, re-grade, and sod all disturbed areas to match existing 1.3.1.9. Restoration of concrete and asphalt

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.