Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

December 11, 2023

May 30, 2024

Cottage Ave

Site Work

No Information to Display

$261,000.00

Public - City

img_map_placeholder

Cottage Ave, Danvers, MA

Subscribe to View Full Documents

Cottage Avenue Sewer Replacement Project Estimated Cost $261,000 The work of this contract includes furnishing all labor, materials, and equipment necessary to perform excavation and removal of approximately 220 linear feet of 8-inch asbestos cement pipe and replaced with 220 linear feet of 8-inch PVC and the replacement of three (3) sewer services, totaling approximately 77 linear feet of 6-inch PVC or DI and installation of 4-inch minimum compacted thickness of temporary bituminous concrete and repairing sections of berm and sidewalks. Scope of work includes a base bid and one additive alternate for milling and overlaying the entirety of Cottage Avenue All questions about the meaning or intent of the Contract Documents shall be received in writing by the Town of Danvers, 1 Burroughs Street, Danvers MA 01923 Attn: Stephen King, P.E., at least ten days before the date herein set for the opening of bids Question Deadline 10/30/2023 1. Excavate and remove the existing asbestos concrete (lined with cured-in-place pipe) sewer, approximately 220 linear feet, and properly dispose of it. 2. Relay approximately 220 linear feet of sewer, and Five (5) sewer services (between the main and back of sidewalk). 3. Pave the sewer trench with 3-inches of binder. 4. After a period of at least 90 days, mill the entirety of Cottage Avenue and overlay with permanent pavement.

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.