Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

November 30, 2023

December 15, 2023

Froebel Dr

Paving, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

Froebel Dr, Beloit, WI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Site Directions: Froebel Drive, West of Afton Rd Coordinates: 42.527973, -89.046103 OR 4231'40.7"N, 8902'46.0"W Furnishing Labor, Materials, Tools, and Equipment Necessary for C23-29, Froebel Dr Sanitary Sewer Extension. The Work for Which Bids Are Asked Includes the Following: Approximately: 826 Linear Feet of 8-inch Sanitary Sewer, 2 Sanitary Manholes, 2150 Square Yards of Road Reconstruction, and Miscellaneous Items Associated With Above Work. All Bidders must execute and file a Bidder's Proof of Responsibility Questionnaire no later than the close of business on Wednesday, October 25 which is seven (7) calendar days prior to the bid opening BID SECURITY: A certified check or satisfactory Bid Bond payable to the City of Beloit in the amount of 5% of the Bid shall accompany each bid as a guarantee, that if the bid is accepted, the bidder will execute and file the Agreement, the Contract Performance Bond and Payment Bond, as required by the Contract Documents, within ten (10) days after the Notice of Award of the Contract by the City of Beloit. Failure of the part of the Bidder to do so will result in forfeiture of the Bidder's certified check or Bid Bond to the City of Beloit as liquidated damages. CONTRACT SECURITY: The Bidder to whom a Contract is awarded shall be required to furnish both a Performance Bond and a Payment Bond acceptable to the City of Beloit for 110% of the Contract Price for each of the above Bonds, in accordance with the requirement of the Contract Documents. The City of Beloit reserves the right to reject any and all bids, waive any informalities in bidding, or to accept the bid or bids, which best serve the interests of the City of Beloit. All Bidders must execute and file a Bidder's Proof of Responsibility Questionnaire no later than the close of business on Wednesday, October 25 which is seven (7) calendar days prior to the bid opening. It is incumbent on the bidder to supply the required documentation in sufficient time to be evaluated before this deadline. Forms are available at the Utilities and Engineering Facility

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.