Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

December 18, 2023

No Information to Display

To Be Determined

New Construction

No Information to Display

$10,000,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Logan, UT

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Jacobsen Construction has been awarded the new South Campus Housing project on the USU Campus in Logan, Utah. The Design Phase of this project has concluded and at this time, Jacobsen is soliciting final Trade Contractor bids for award consideration. 03A Concrete 03B Reinforcing Steel 04A Masonry 05A Structural Steel and Metal Fabrications 06A Rough Carpentry 06B Architectural Woodwork 07A Dampproofing, Waterproofing, & Air Barriers 07B Insulation & Firestopping 07C Roofing 07D Fireproofing 07E Joint Sealants 07M Metal Panels 7E EIFS 08A Doors, Frames & Hardware 08C Elevator Smoke Doors 08D Windows, Storefronts, Curtainwalls, & Glazing 08E Fiberglass Windows 09A Gypsum Assemblies 09C Tiling 09D Acoustical Ceilings & Wall Panels 09E Flooring 09F Shower Pans and Surrounds 09G Painting 10A Specialties 10E Wall Protection 12A Window Treatment 14A Elevators 21A Fire Protection 22A Plumbing & Mechanical As the construction of early-phase earthwork foundation elements has commenced, Jacobsen anticipates construction of the remaining scopes of work contained within this bid package to begin before the end of 2023. The overall construction duration is anticipated to be approximately 22 months and the the project is expected to attain substantial completion in June 2025.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.