Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 29, 2023

December 29, 2023

No Information to Display

289 Main St

Renovation

No Information to Display

$300,000.00

Public - City

img_map_placeholder

289 Main St, Bangor, ME

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The scope of work will include the removal and disposal of existing equipment as well as installation of two (2) new commercially designed hot water boilers. Proposers will be required to attend a mandatory scheduled pre-bid meeting. Only attendee bids will be accepted. If emailing the proposal, please reference "Proposal No. P24-14: Central Fire Station Boilers Replacement" in the subject line. Question Deadline 11/10/2023 at 4:30 PM ET Any questions must be directed in writing to bids@bangormaine.gov. The City will provide a response by 4:30 P.M. on Tuesday, November 14, 2023. This response will be in the form of an addendum, accessible on the City s website. at electronically. The City reserves the right to reject any proposals, waive any informalities or defects in proposals, or accept a higher cost proposal if it is deemed to be in the best interest of the City. The City also reserves the right to clarify with the successful proposer. Scope of Work A. Work will include the replacement of 2 HB Smith "Mills" boilers and the installation of 2 new replacement boilers. B. Additional work will also include replacing the existing circulators, expansion tank, controls, valves, and gauges in the existing boiler room. C. Reconnection to the existing Amtrol Boilermate for domestic hot water. D. New boilers must integrate into existing Honeywell zone controls. E. All pipes in the boiler room are to be insulated to the extent possible. F. The boilers will fire on natural gas. G. The existing masonry chimney is to be updated, as required by the Code. H. Successful Proposer will need to coordinate and work with the Fire Chief or their designee. I. Discontinuance and removal of boiler room fuel oil system, including day tank, pump, and piping. J. The successful Proposer will need to remove and dispose of the existing boilers as well as other removed parts and equipment in accordance with all applicable Federal, State, and local laws and regulations. K. Successful Proposer must acquire required permits and inspections.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.