Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

April 30, 2024

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

$5,000,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Miami, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Project Threshold : Project is Less than $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 07 Selection Method : Expanded Letter of Response Project Description : Miscellaneous Design Support - continuing Plain Language Description : Consultant Services Are Required for Miscellaneous Design Support That Will Be Assigned as Individual Task Work Orders as the Projects or Services Are Identified. The General Objective is for the Designer/ Engineer to Prepare a Set of Contract Documents Including Plans, Specifications for the Design, Supporting Engineering Analysis, Calculations and Other Technical Documents in Accordance With Fdot Policy, Procedures and Requirements. These Contract Documents Will Be Used by the Construction Contractor to Build the Project. These Contract Documents Will Be Used by the Department or Its Construction Engineering Inspection (Cei) Representatives for Inspection and Final Acceptance of the Project. Number of contracts that may be awarded from this advertisement : 1 Advertisement Date 10/17/2023 Response Deadline Date/Time 10/31/2023 02:30 am Shortlist Selection Date/Time 11/13/2023 08:00 pm Technical Review Committee Meeting 1 Date/Time 11/17/2023 01:30 am Final Selection Date/Time 12/04/2023 08:00 pm Negotiations Period Begin Date 12/12/2023 Negotiations Period Ending Date 1/13/2024 The method of contractor selection has not been determined at this time. FDOT - RFP - Miscellaneous Design Support - continuing

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.