Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
November 14, 2023
January 15, 2024
March 15, 2024
Multiple Locations
Site Work
No Information to Display
$1,500,000.00
Public - City
Multiple Locations, Farmington, MO
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
The City of Farmington is accepting bids for "2024 Electric Pole Replacement Project". The project shall be defined as providing machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to provide electric facility construction in accordance with the conditions and Specifications as directed by the City. All BIDS must be made on the BID FORM in the contract included in the bid package, with all blank spaces for BID prices filled in, in ink or typewritten, fully completed and executed when submitted. One (1) copy of the BID FORM is required. A bid is invalid if it has not been deposited at the designated location prior to the time and date for receipt of bids. Bids received by facsimile or e-mail will not be considered valid. Right to Reject Bids. The CITY may consider invalid any bid not prepared and submitted in accordance with the provisions hereof, and may waive any irregularities, or reject any and all bids. Withdrawing of Bids. Any bid may be withdrawn prior to the schedule time for the opening of bids or authorized postponement thereof. Each bidder by making his bid represents that he has read and understands the bid documents and that he has familiarized himself the local conditions and specifications under which the work is to be performed. 4. Interpretations and Addenda. No interpretation of any plans, specifications, or other condition will be made verbally to any bidder. Every such request for interpretation shall be made in writing via e-mail to llacy@farmington-mo.gov, and shall be made not less than five business days prior to the scheduled bid opening. Any and all interpretations, or addenda to the specifications, will be made in writing to all plan holders via e-mail or personal delivery not less than two days prior to the scheduled bid opening. 5. Bid Bond. All bids for projects exceeding $100,000 will be accompanied by a bid bond payable to the CITY, or a cashier's check issued by a solvent bank, for five percent (5%) of the total amount of the bid, including all bid alternates. Bid bonds will be returned to all unsuccessful bidders upon notification of award to the successful bidder. Bid bond will be returned to the successful bidder upon receipt of the executed contract and payment and performance bond. 6. Payment and Performance Bond. The successful bidder for all projects exceeding $50,000 will be required to furnish a surety bond, or bonds, as security for faithful performance of the contract and for the payment of all firms or persons performing labor or furnishing materials for the work performed under the contract. The surety on such bond, or bonds, shall be a surety company satisfactory to the CITY. 7. Compliance with Prevailing Wage. Per HB 1729, Prevailing wage law previsions are not required for projects with a cost of less than $75,000. If the bid for this work is $75,000 or more, the CONTRACTOR shall pay wages not less than the prevailing wage for the type of work performed under this agreement as determined by the Missouri Department of Labor and Industrial Relations, Division of Labor Standards. The CONTRACTOR further agrees to comply with Prevailing Wage Laws as prescribed in Section 290.290 RSMo, and to ensure compliance with the aforementioned statutes by all sub-contractors performing work under this agreement. The CONTRACTOR will pay the CITY as and for liquidated damages, one-hundred dollars ($100.00) per day, or portion of day, if a worker is paid less than the prevailing rate for any work done under the contract by the CONTRACTOR or by any subcontractor. 2.Public Liability and Property Damage Insurance. The Contractor shall be required to furnish Public Liability and Property Damage Insurance with coverage to name and protect the CITY and the Contractor from all claims for damages for personal injury, including accidental death, as well as claims for property damages, which may arise from work performed under this agreement, whether such claim be a result of actions by the Contractor or any sub-contractor performing work under this agreement. The insurance policy shall be not less than $1,000,000 personal injury per occurrence and not less than $1,000,000 aggregate property damage. In the event the insurance coverage required under this section is cancelled by the Contractor during the performance of the work under, the CITY may at its option employ another Contractor to complete the project, and the Contractor shall indemnify and hold the CITY harmless from any and all damages it sustains as a result of the Contractor's failure to maintain insurance coverage.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Farmington, MO
Bid Date: Sep 24 2024
Farmington, MO
Bid Date: Oct 30 2023
Farmington, MO
Bid Date: Aug 17 2023
Farmington, MO
Bid Date: Jul 25 2023
Farmington, MO
Bid Date: Oct 12 2023
Kansas City, MO
--
Richmond Heights, MO
Bid Date: Oct 31 2023
Center, MO
Bid Date: Nov 06 2023
Harrisonville, MO
Bid Date: Oct 18 2023
Gladstone, MO
Bid Date: Oct 31 2023
Town and Country, MO
--
St Peters, MO
Bid Date: Nov 10 2023
Buffalo, MO
Bid Date: Oct 03 2023
Springfield, MO
Bid Date: Nov 09 2023
Springfield, MO
Bid Date: Oct 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
