Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 1, 2024

October 31, 2024

15070 Highway 101,

Paving, Site Work

No Information to Display

$1,000,000.00

Public - State/Provincial

img_map_placeholder

15070 Highway 101,, Powell River, BC

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Saltery Bay Ferry Terminal sewage treatment system replacement. TIMELINE: Request for proposal for the successful proponent to act as the Prime Consultant, and provide and facilitate all engineering design services, has been issued by the owner. PROJECT SCHEDULE: Phase 1 Awarded (approx.): November 6, 2023 Phase 1 Complete December 15, 2023 Phase 2 & 3 Awarded January 8, 2024 Phase 2 Complete March 1, 2024 Construction RFP award: May 1, 2024 Construction Begins August 2024 Construction Complete: October 2024.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.