Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 31, 2024

No Information to Display

FL-714

Paving, Site Work

No Information to Display

$915,000.00

Public - State/Provincial

img_map_placeholder

FL-714, Palm City, FL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 04 Selection Method : Letter of Response and Abbreviated Technical Proposal Project Description : Resurfacing of SR-714/SE Monterey Road from S.W Palm City Plain Language Description : Resurfacing of SR-714/SE Monterey Road from S.W Palm City Rd. to 400 ft S of SR-5/US-1 The purpose of this project is to resurface the existing pavement, rehabilitate the roadway sections that are in distress, and restore the final surface on SR 714/SE Monterey Road from SW Palm City Road to 400 feet south of SR-5/US-1. Other objectives include the replacement of an existing 72- inch stormwater pipe from the south side of the existing box culvert at SR-714/SE Monterey Road and SE Rays Way intersection to the fork of SE Monterey Road extension. Additional services may include but are not limited to roadway design, lighting, signalization, signing and marking, survey, photogrammetry, and geotechnical. Number of contracts that may be awarded from this advertisement : 1 Advertisement Date 10/17/2023 Response Deadline Date/Time 10/31/2023 02:30 am Longlist Date/Time 11/03/2023 12:30 am Shortlist Selection Date/Time 11/13/2023 07:45 pm Technical Review Committee Meeting 1 Date/Time 12/11/2023 08:30 pm Final Selection Date/Time 1/08/2024 07:45 pm Negotiations Period Begin Date 1/13/2024 Negotiations Period Ending Date 4/01/2024 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - Resurfacing of SR-714/SE Monterey Road from S.W Palm City

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.