Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 10, 2023

December 11, 2023

June 8, 2024

Multiple Locations

Renovation

No Information to Display

$200,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Rolla, MO

Subscribe to View Full Documents

Questions regarding the scope of work and commercial conditions should be directed to Jack Mentink, PE, Jackmentink@mst.edu SCOPE OF WORK a. The Contractor shall furnish all labor, materials, tools, equipment necessary for, and incidental to, construction of this project as indicated on Drawings and specified herein. b. Work shall include everything requisite and necessary to finish work properly, notwithstanding that every item of labor or materials or accessories required to make project complete may not be specifically mentioned. c. General Description of Work: (1) Project consists of replacing the existing fire alarm system notification and initiation devices to existing fire alarm systems in Residential Commons 1 & 2. The existing systems are horn/strobe systems and the existing fire alarm control panels shall remain and be reused as they have been recently replaced in both Residential Commons 1 & 2. (2) Demolition shall consist of removing existing horns, horn/strobes, strobes, duct detectors, smoke detectors, heat detectors, control and monitor modules, fire alarm power supplies, selective wiring, and all other appurtenances Provide and install new horns, horn/strobes, strobes, duct detectors, smoke detectors, heat detectors, control and monitor modules, fire alarm power supplies, fire alarm control panel, wiring and all other appurtenances for a complete system. (4) Electrical work shall consist of new wiring from existing panelboards to new fire alarm power supplies and reconnection to new fire alarm control panel. Work shall be performed under this Contract on Missouri University of Science and Technology Campus, at Residential Commons 1, 710 Tim Bradley Way and Residential Commons 2, 1575 Watts Drive, Rolla, Missouri 65409

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.