Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 1, 2025

No Information to Display

4780 Webb Bridge Rd

Paving, Site Work

No Information to Display

$875,000.00

Public - City

img_map_placeholder

4780 Webb Bridge Rd, Alpharetta, GA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The existing septic system servicing the soccer fields' restroom is failing and conflicts with the proposed upper field synthetic turf field. This project would abandon the septic system and connect the restroom building to an existing sanitary sewer along Webb Bridge Road. The project consists of 610 linear feet of force main line, 1225 linear feet of gravity line, 6 manholes, possible reconstruction of up to 500 linear feet of existing sidewalk, and reconstruction of approximately 550 linear feet of existing gravel trail. Total costs are estimated at $875,000. Current timelines have the project being designed during FY 2024 with construction proceeding in FY 2025. However, due to the large capital requirement, this project is proposed to be funded in phases with $437,500 this fiscal year followed by a request for the remaining funding in FY 2025 ($437,500). Operating Budget Impact: Septic system maintenance and repair will decline, but monthly utility costs will increase. There will be costs associated with the lift station, but they should be minimal. The project is include in the City's 2023-2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.