Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 3, 2023

December 4, 2023

April 12, 2024

16500 NW 87th Ave

Renovation

No Information to Display

$60,000.00

Public - City

img_map_placeholder

16500 NW 87th Ave, Miami Lakes, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Roberto Alonso Community Center HVAC Replacement The Town of Miami Lakes is seeking proposals from a licensed and insured contractor for the replacement of one (1) of the HVAC infrastructures which currently includes two (2) separate units at the Miami Lakes Roberto Alonso Community Center. The system includes: one (1) system for the center's meeting rooms. All proposals will provide a "turn-key" solution and must include all costs, labor, machinery, tools, means of transportation, supplies, equipment, materials, services, and permitting to be considered a valid proposal. The current HVAC system is 15 tons Trane split unit. This unit is to be replaced with a similar or recommended unit. Any questions concerning the substance of this, or any other solicitation advertised by the Town must be submitted in writing to procurement@miamilakes-fl.gov while the Cone of Silence is in effect. No other communications, oral or otherwise, will be accepted. The Contractor shall obtain Substantial Completion of the Work within thirty (120) Days of the Notice to Proceed being issued by the Town. Contractor must obtain Final Completion within seven (10) Days after obtaining Substantial Completion. The scope of work includes, but is not limited to: - Conduct pre-construction walk-through to inspect and verify current unit and check measurements prior to purchasing unit. - Removal and disposal of existing HVAC system. - Installation of new HVAC system. - Match existing curb / modify as needed. - Permit fees associated with above-mentioned work. - Hook-up to existing duct-mounted smoke detectors. - Hoisting of above-mentioned equipment. - Startup of A/C equipment mentioned above. - Connection to existing HVAC control system. - Install all necessary wiring. - Any and all plumbing as-needed to remove or install new unit. - Include manufacturer's warranty as well as other warranty in accordance with the contract.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.